Case Study

Shahrood Azad University Central Skylight

Shahrood Azad University Central Skylight case study for Sandwich Panel Systems, focused on engineering coordination, controlled execution, and project risk reduction.

Project
Shahrood Azad University Central Skylight
Location
Shahrood, Iran
System
Sandwich Panel Systems
Proof fields are intentionally pending until verified project records are available.
Shahrood Azad University Central Skylight technical placeholder

Project snapshot

Project typeCentral Skylight Roof
LocationShahrood, Iran
Area400 m²
DurationPending verified project data
MetricsPending verified project data

Project challenge

The skylight was installed on an existing roof structure, requiring careful control of dead loads, waterproofing details and structural integration.

  • Water leakage
  • Excessive roof loading
  • Insufficient daylight
  • High daytime energy consumption
The skylight was installed on an existing roof structure, requiring careful control of dead loads, waterproofing details and structural integration.

Engineering decision

A dome-shaped space frame with multiwall polycarbonate panels was selected to provide uniform daylight while minimizing structural weight.

A dome-shaped space frame with multiwall polycarbonate panels was selected to provide uniform daylight while minimizing structural weight.

Selected system logic placeholder for Sandwich Panel Systems.

Coordination note pending verified shop drawings, procurement files, and site notes.

Execution detail

Installation sequence

Approximately 400 m² of naturally illuminated interior space created without intermediate supports.

Procurement control

Procurement control pending verified bill of materials and accessory scope.

Coordination with site team

Site coordination pending verified project communication records.

Quality checkpoints

  • Drawing approval status pending
  • Material and accessory list pending
  • Installation inspection records pending

Technical proof gallery

Pending verified project data

Measured result

Pending verified project data

Completion proofApproximately 400 m² of naturally illuminated interior space created without intermediate supports.
Waterproofing resultPending verified project data
DurationPending verified project data
Cost impactPending verified project data

Risks controlled before publication

Water leakage

Water leakage was controlled through engineering review, coordinated detailing, and installation checkpoints.

Excessive roof loading

Excessive roof loading was controlled through engineering review, coordinated detailing, and installation checkpoints.

Insufficient daylight

Insufficient daylight was controlled through engineering review, coordinated detailing, and installation checkpoints.

High daytime energy consumption

High daytime energy consumption was controlled through engineering review, coordinated detailing, and installation checkpoints.

Related services and resources

Sandwich Panel Systems

Primary service category connected to this case study structure.

View system

Panel Selection Guide

Related engineering resource for earlier technical review.

View system

Start with verified engineering review

Send drawings or project context so SIPANEL can review scope before claims or metrics are published.