Case Study
Shahrood Azad University Central Skylight
Shahrood Azad University Central Skylight case study for Sandwich Panel Systems, focused on engineering coordination, controlled execution, and project risk reduction.
Proof fields are intentionally pending until verified project records are available.
Project snapshot
Project challenge
The skylight was installed on an existing roof structure, requiring careful control of dead loads, waterproofing details and structural integration.
- Water leakage
- Excessive roof loading
- Insufficient daylight
- High daytime energy consumption
Engineering decision
A dome-shaped space frame with multiwall polycarbonate panels was selected to provide uniform daylight while minimizing structural weight.
A dome-shaped space frame with multiwall polycarbonate panels was selected to provide uniform daylight while minimizing structural weight.
Selected system logic placeholder for Sandwich Panel Systems.
Coordination note pending verified shop drawings, procurement files, and site notes.
Execution detail
Installation sequence
Approximately 400 m² of naturally illuminated interior space created without intermediate supports.
Procurement control
Procurement control pending verified bill of materials and accessory scope.
Coordination with site team
Site coordination pending verified project communication records.
Quality checkpoints
- Drawing approval status pending
- Material and accessory list pending
- Installation inspection records pending
Technical proof gallery
Pending verified project data
Measured result
Pending verified project data
Risks controlled before publication
Water leakage
Water leakage was controlled through engineering review, coordinated detailing, and installation checkpoints.
Excessive roof loading
Excessive roof loading was controlled through engineering review, coordinated detailing, and installation checkpoints.
Insufficient daylight
Insufficient daylight was controlled through engineering review, coordinated detailing, and installation checkpoints.
High daytime energy consumption
High daytime energy consumption was controlled through engineering review, coordinated detailing, and installation checkpoints.
Related services and resources
Sandwich Panel Systems
Primary service category connected to this case study structure.
View systemPanel Selection Guide
Related engineering resource for earlier technical review.
View systemRelated case studies
Start with verified engineering review
Send drawings or project context so SIPANEL can review scope before claims or metrics are published.



