Case Study

32-Bed Military Hospital

Operational hospital delivered from excavation to readiness in less than 50 days during the COVID-19 emergency.

Project
32-Bed Military Hospital
Location
Raz & Jargalan, North Khorasan, Iran
System
Sandwich Panel Systems
Full EPC delivery by SIPANEL — engineering, procurement, and construction.
Project Video

Case Study

Project snapshot

Project typeEmergency hospital — Full EPC delivery
LocationRaz & Jargalan, North Khorasan, Iran
Area1,000 m²
DurationLess than 50 days

Project challenge

During the COVID-19 emergency, a fully operational 32-bed military hospital was needed from excavation to readiness in under 50 days, requiring full EPC coordination.

  • Schedule overrun beyond 50-day target
  • Coordination failures across EPC disciplines
  • Envelope weather protection delays
  • Internal partition installation bottlenecks
During the COVID-19 emergency, a fully operational 32-bed military hospital was needed from excavation to readiness in under 50 days, requiring full EPC coordination.

Engineering decision

SIPANEL delivered the complete project scope including engineering, shop drawings, excavation, construction, sandwich panel envelope, internal partitions, and full installation readiness.

Engineering teams coordinated full EPC delivery — from excavation and structural construction to sandwich panel envelope, internal partitions, and final readiness — within an emergency timeline.

Selected system logic placeholder for Sandwich Panel Systems.

Coordination note pending verified shop drawings, procurement files, and site notes.

Execution detail

Installation sequence

Execution followed a compressed 50-day schedule covering excavation, construction, sandwich panel cladding, internal partitioning, and installation to operational readiness.

Procurement control

Procurement control pending verified bill of materials and accessory scope.

Coordination with site team

Site coordination pending verified project communication records.

Quality checkpoints

  • Drawing approval status pending
  • Material and accessory list pending
  • Installation inspection records pending

Measured result

Completion proofA fully operational 32-bed military hospital was delivered from excavation to readiness in less than 50 days during the COVID-19 emergency.
DurationLess than 50 days

Risks controlled before publication

Schedule overrun beyond 50-day target

Compressed scheduling with daily coordination across engineering, procurement, and execution teams.

Coordination failures across EPC disciplines

Integrated EPC management from excavation to final handover, eliminating coordination gaps.

Envelope weather protection delays

Controlled sandwich panel installation for roof and walls following an engineered timeline.

Internal partition installation bottlenecks

Coordinated interior partition sequencing with structural and MEP teams to prevent bottlenecks.

Have a time-critical project?

Send project drawings or context so SIPANEL engineering can review scope, risks, and timeline.