Case Study

Shahr Babak Wrestling Hall

Shahr Babak Wrestling Hall case study for Standing Seam and ZIP Tech Roofing, focused on engineering coordination, controlled execution, and project risk reduction.

Project
Shahr Babak Wrestling Hall
Location
Shahr Babak, Kerman, Iran
System
Standing Seam and ZIP Tech Roofing
Proof fields are intentionally pending until verified project records are available.
Shahr Babak Wrestling Hall technical placeholder

Project snapshot

Project typeMulti-dome wrestling sports complex
LocationShahr Babak, Kerman, Iran
Area900 m2
DurationPending verified project data
MetricsPending verified project data

Project challenge

Multiple dome-shaped sports halls required curved ZIP panel coordination, structural alignment, waterproofing continuity, and visually consistent roof finishing.

  • Curved roof alignment errors
  • Water penetration at dome transitions
  • ZIP panel deformation
  • Installation sequencing conflicts
Multiple dome-shaped sports halls required curved ZIP panel coordination, structural alignment, waterproofing continuity, and visually consistent roof finishing.

Engineering decision

SIPANEL developed an engineered ZIP panel roofing system optimized for curved dome geometry, waterproofing integration, and multi-structure installation coordination.

Engineering teams prepared coordinated shop drawings, curved ZIP panel layouts, waterproofing details, and installation sequencing strategies to maintain dome symmetry and drainage continuity.

Selected system logic placeholder for Standing Seam and ZIP Tech Roofing.

Coordination note pending verified shop drawings, procurement files, and site notes.

Execution detail

Installation sequence

Installation followed controlled curved-surface procedures, alignment checkpoints, fastening verification, and coordinated sealing workflows.

Procurement control

Procurement control pending verified bill of materials and accessory scope.

Coordination with site team

Site coordination pending verified project communication records.

Quality checkpoints

  • Drawing approval status pending
  • Material and accessory list pending
  • Installation inspection records pending

Technical proof gallery

Pending verified project data

Measured result

Pending verified project data

Completion proofThree structurally coordinated dome-shaped wrestling halls were delivered with reliable ZIP panel roof performance and controlled installation quality.
Waterproofing resultPending verified project data
DurationPending verified project data
Cost impactPending verified project data

Risks controlled before publication

Curved roof alignment errors

Curved roof alignment errors was controlled through engineering review, coordinated detailing, and installation checkpoints.

Water penetration at dome transitions

Water penetration at dome transitions was controlled through engineering review, coordinated detailing, and installation checkpoints.

ZIP panel deformation

ZIP panel deformation was controlled through engineering review, coordinated detailing, and installation checkpoints.

Installation sequencing conflicts

Installation sequencing conflicts was controlled through engineering review, coordinated detailing, and installation checkpoints.

Related services and resources

Standing Seam and ZIP Tech Roofing

Primary service category connected to this case study structure.

View system

Roof Leakage Prevention Checklist

Related engineering resource for earlier technical review.

View system

Start with verified engineering review

Send drawings or project context so SIPANEL can review scope before claims or metrics are published.