Case Study
Shahr Babak Wrestling Hall
Shahr Babak Wrestling Hall case study for Standing Seam and ZIP Tech Roofing, focused on engineering coordination, controlled execution, and project risk reduction.
Proof fields are intentionally pending until verified project records are available.
Project snapshot
Project challenge
Multiple dome-shaped sports halls required curved ZIP panel coordination, structural alignment, waterproofing continuity, and visually consistent roof finishing.
- Curved roof alignment errors
- Water penetration at dome transitions
- ZIP panel deformation
- Installation sequencing conflicts
Engineering decision
SIPANEL developed an engineered ZIP panel roofing system optimized for curved dome geometry, waterproofing integration, and multi-structure installation coordination.
Engineering teams prepared coordinated shop drawings, curved ZIP panel layouts, waterproofing details, and installation sequencing strategies to maintain dome symmetry and drainage continuity.
Selected system logic placeholder for Standing Seam and ZIP Tech Roofing.
Coordination note pending verified shop drawings, procurement files, and site notes.
Execution detail
Installation sequence
Installation followed controlled curved-surface procedures, alignment checkpoints, fastening verification, and coordinated sealing workflows.
Procurement control
Procurement control pending verified bill of materials and accessory scope.
Coordination with site team
Site coordination pending verified project communication records.
Quality checkpoints
- Drawing approval status pending
- Material and accessory list pending
- Installation inspection records pending
Technical proof gallery
Pending verified project data
Measured result
Pending verified project data
Risks controlled before publication
Curved roof alignment errors
Curved roof alignment errors was controlled through engineering review, coordinated detailing, and installation checkpoints.
Water penetration at dome transitions
Water penetration at dome transitions was controlled through engineering review, coordinated detailing, and installation checkpoints.
ZIP panel deformation
ZIP panel deformation was controlled through engineering review, coordinated detailing, and installation checkpoints.
Installation sequencing conflicts
Installation sequencing conflicts was controlled through engineering review, coordinated detailing, and installation checkpoints.
Related services and resources
Standing Seam and ZIP Tech Roofing
Primary service category connected to this case study structure.
View systemRoof Leakage Prevention Checklist
Related engineering resource for earlier technical review.
View systemRelated case studies
Start with verified engineering review
Send drawings or project context so SIPANEL can review scope before claims or metrics are published.



