Case Study

Rouzbeh Charity Complex

Rouzbeh Charity Complex case study for Sandwich Panel Systems, focused on engineering coordination, controlled execution, and project risk reduction.

Project
Rouzbeh Charity Complex
Location
Zanjan, Iran
System
Sandwich Panel Systems
Proof fields are intentionally pending until verified project records are available.
Rouzbeh Charity Complex technical placeholder

Project snapshot

Project typeCentral atrium roofing with space frame structure
LocationZanjan, Iran
Area1,000 m²
DurationPending verified project data
MetricsPending verified project data

Project challenge

Installing a long-span roof over a multi-storey structure under construction while maintaining compatibility with the reinforced concrete building frame.

  • Excessive dead load on building frame
  • Construction delays from weather exposure
  • Incompatibility with RC structure
  • Long-term maintenance issues
Installing a long-span roof over a multi-storey structure under construction while maintaining compatibility with the reinforced concrete building frame.

Engineering decision

A lightweight space frame system combined with insulated sandwich panels was selected to optimize weight, speed, and thermal performance over the central atrium.

A lightweight space frame system combined with insulated sandwich panels was selected to optimize weight, speed, and thermal performance over the central atrium.

Selected system logic placeholder for Sandwich Panel Systems.

Coordination note pending verified shop drawings, procurement files, and site notes.

Execution detail

Installation sequence

A fully covered central space providing approximately 1,000 m² of protected area integrated into the multi-storey building structure.

Procurement control

Procurement control pending verified bill of materials and accessory scope.

Coordination with site team

Site coordination pending verified project communication records.

Quality checkpoints

  • Drawing approval status pending
  • Material and accessory list pending
  • Installation inspection records pending

Technical proof gallery

Pending verified project data

Measured result

Pending verified project data

Completion proofA fully covered central space providing approximately 1,000 m² of protected area integrated into the multi-storey building structure.
Waterproofing resultPending verified project data
DurationPending verified project data
Cost impactPending verified project data

Risks controlled before publication

Excessive dead load on building frame

Excessive dead load on building frame was controlled through engineering review, coordinated detailing, and installation checkpoints.

Construction delays from weather exposure

Construction delays from weather exposure was controlled through engineering review, coordinated detailing, and installation checkpoints.

Incompatibility with RC structure

Incompatibility with RC structure was controlled through engineering review, coordinated detailing, and installation checkpoints.

Long-term maintenance issues

Long-term maintenance issues was controlled through engineering review, coordinated detailing, and installation checkpoints.

Related services and resources

Sandwich Panel Systems

Primary service category connected to this case study structure.

View system

Panel Selection Guide

Related engineering resource for earlier technical review.

View system

Start with verified engineering review

Send drawings or project context so SIPANEL can review scope before claims or metrics are published.