Case Study

Imam Khomeini Airport Hajj Passenger Terminal

Imam Khomeini Airport Hajj Passenger Terminal case study for Sandwich Panel Systems, focused on engineering coordination, controlled execution, and project risk reduction.

Project
Imam Khomeini Airport Hajj Passenger Terminal
Location
Tehran, Iran
System
Sandwich Panel Systems
Proof fields are intentionally pending until verified project records are available.
Imam Khomeini Airport Hajj Passenger Terminal technical placeholder

Project snapshot

Project typePassenger Waiting Hall
LocationTehran, Iran
Area5,000 m²
DurationPending verified project data
MetricsPending verified project data

Project challenge

The primary challenge was the extremely compressed schedule between project award and the return of Hajj pilgrims, requiring immediate completion and operational readiness.

  • Operational delays before Hajj return flights
  • Airport capacity shortages
  • Insufficient daylight inside waiting areas
  • Disruption of passenger handling operations
The primary challenge was the extremely compressed schedule between project award and the return of Hajj pilgrims, requiring immediate completion and operational readiness.

Engineering decision

Fast-track procurement, parallel installation activities, and integration of polycarbonate wall systems to maximize natural daylight within the hall.

Fast-track procurement, parallel installation activities, and integration of polycarbonate wall systems to maximize natural daylight within the hall.

Selected system logic placeholder for Sandwich Panel Systems.

Coordination note pending verified shop drawings, procurement files, and site notes.

Execution detail

Installation sequence

Successful completion and handover of a 5,000 m² airport facility in less than seven days.

Procurement control

Procurement control pending verified bill of materials and accessory scope.

Coordination with site team

Site coordination pending verified project communication records.

Quality checkpoints

  • Drawing approval status pending
  • Material and accessory list pending
  • Installation inspection records pending

Technical proof gallery

Pending verified project data

Measured result

Pending verified project data

Completion proofSuccessful completion and handover of a 5,000 m² airport facility in less than seven days.
Waterproofing resultPending verified project data
DurationPending verified project data
Cost impactPending verified project data

Risks controlled before publication

Operational delays before Hajj return flights

Operational delays before Hajj return flights was controlled through engineering review, coordinated detailing, and installation checkpoints.

Airport capacity shortages

Airport capacity shortages was controlled through engineering review, coordinated detailing, and installation checkpoints.

Insufficient daylight inside waiting areas

Insufficient daylight inside waiting areas was controlled through engineering review, coordinated detailing, and installation checkpoints.

Disruption of passenger handling operations

Disruption of passenger handling operations was controlled through engineering review, coordinated detailing, and installation checkpoints.

Related services and resources

Sandwich Panel Systems

Primary service category connected to this case study structure.

View system

Panel Selection Guide

Related engineering resource for earlier technical review.

View system

Start with verified engineering review

Send drawings or project context so SIPANEL can review scope before claims or metrics are published.