Case Study
Fadak Mall Glass Skylight
Fadak Mall Glass Skylight case study for Sandwich Panel Systems, focused on engineering coordination, controlled execution, and project risk reduction.
Proof fields are intentionally pending until verified project records are available.
Project snapshot
Project challenge
The project required the installation of a glass enclosure over a three-dimensional elliptical form while maintaining geometric accuracy, waterproofing performance, and visual transparency.
- Geometric distortion
- Water leakage
- Mismatch between structure and glazing
- Reduced daylight performance
Engineering decision
Precise geometric control, custom glazing details, and installation management to achieve a seamless architectural skylight.
Precise geometric control, custom glazing details, and installation management to achieve a seamless architectural skylight.
Selected system logic placeholder for Sandwich Panel Systems.
Coordination note pending verified shop drawings, procurement files, and site notes.
Execution detail
Installation sequence
Successful completion of a 500 m² glass skylight delivering natural daylight to the mall atrium.
Procurement control
Procurement control pending verified bill of materials and accessory scope.
Coordination with site team
Site coordination pending verified project communication records.
Quality checkpoints
- Drawing approval status pending
- Material and accessory list pending
- Installation inspection records pending
Technical proof gallery
Pending verified project data
Measured result
Pending verified project data
Risks controlled before publication
Geometric distortion
Geometric distortion was controlled through engineering review, coordinated detailing, and installation checkpoints.
Water leakage
Water leakage was controlled through engineering review, coordinated detailing, and installation checkpoints.
Mismatch between structure and glazing
Mismatch between structure and glazing was controlled through engineering review, coordinated detailing, and installation checkpoints.
Reduced daylight performance
Reduced daylight performance was controlled through engineering review, coordinated detailing, and installation checkpoints.
Related services and resources
Sandwich Panel Systems
Primary service category connected to this case study structure.
View systemPanel Selection Guide
Related engineering resource for earlier technical review.
View systemRelated case studies
Start with verified engineering review
Send drawings or project context so SIPANEL can review scope before claims or metrics are published.



