SIPANEL Engineering Resource

Sandwich Panel Selection Guide

A decision guide for choosing panel type, core material, thickness, joint logic, insulation level, and procurement inputs before ordering.

Prepared by
SIPANEL Engineering TeamIndustrial envelope engineering
Technical review
SIPANEL Engineering TeamTechnical review
Last updated
Mar 2026
Preview of the sandwich panel selection guide

Resource Summary

Resource type
Guide
Category
Technical Guides
Difficulty
Technical
Read time
10 min
Availability
Ready for download (PDF)

Introduction

Content in this section is prepared from SIPANEL experience in designing, supplying, and executing industrial envelope systems on real projects.

Choosing sandwich panels only by price or thickness can create thermal, fire, installation, and maintenance problems. This guide frames panel selection around building use, climate, spans, joint behavior, and procurement constraints.

When to Use This Guide

During early design or supplier comparison.

Before finalizing panel thickness, core type, and accessories.

When procurement teams need technical criteria for evaluating offers.

Technical Context

Technical guides cover sandwich panel selection, core types, thickness, thermal insulation values, joint logic, standing seam and ZIP roof drainage, and system comparison to support informed decisions before procurement.

  • Sandwich panel and roofing system selection criteria
  • Thermal insulation and joint coordination
  • Procurement review before ordering

Key Technical Points

A structured overview of the key sections covered in this resource.

Core selection

Match PIR, PUR, mineral wool, or other cores to insulation, fire, acoustic, and budget requirements.

Joint and accessory logic

Panel choice must include joint behavior, flashings, trims, fasteners, and installation tolerances.

Project condition review

Climate, building use, cleaning needs, humidity, and structural spans all affect the correct specification.

Common Mistakes

Comparing only thickness

Equal thickness does not mean equal thermal, fire, or joint performance.

Separating procurement from execution

Missing trims, flashings, or fasteners can delay installation even when panels arrive on time.

Get This Resource

To receive the file and enable technical follow-up, please enter your contact details.

Requested resource: Sandwich Panel Selection Guide

Your information is used only for sending the resource and technical follow-up.

Need Technical Guidance For Your Project?

Whether you are evaluating systems, comparing suppliers, reviewing quantities, or preparing execution drawings, our engineering team can help before procurement begins.