SIPANEL Engineering Resource
Sandwich Panel Selection Guide
A decision guide for choosing panel type, core material, thickness, joint logic, insulation level, and procurement inputs before ordering.

Resource Summary
- Resource type
- Guide
- Category
- Technical Guides
- Difficulty
- Technical
- Read time
- 10 min
- Availability
- Ready for download (PDF)
Introduction
Choosing sandwich panels only by price or thickness can create thermal, fire, installation, and maintenance problems. This guide frames panel selection around building use, climate, spans, joint behavior, and procurement constraints.
For more context on this solution, review Sandwich Panel Systems as the related system.
For an executed example of this approach, see 32-Bed Military Hospital in the project library.
When to Use This Guide
During early design or supplier comparison.
Before finalizing panel thickness, core type, and accessories.
When procurement teams need technical criteria for evaluating offers.
Technical Context
Technical guides cover sandwich panel selection, core types, thickness, thermal insulation values, joint logic, standing seam and ZIP roof drainage, and system comparison to support informed decisions before procurement.
- Sandwich panel and roofing system selection criteria
- Thermal insulation and joint coordination
- Procurement review before ordering
Key Technical Points
A structured overview of the key sections covered in this resource.
Core selection
Match PIR, PUR, mineral wool, or other cores to insulation, fire, acoustic, and budget requirements.
Joint and accessory logic
Panel choice must include joint behavior, flashings, trims, fasteners, and installation tolerances.
Project condition review
Climate, building use, cleaning needs, humidity, and structural spans all affect the correct specification.
Common Mistakes
Comparing only thickness
Equal thickness does not mean equal thermal, fire, or joint performance.
Separating procurement from execution
Missing trims, flashings, or fasteners can delay installation even when panels arrive on time.
Get This Resource
To receive the file and enable technical follow-up, please enter your contact details.
Requested resource: Sandwich Panel Selection GuideRelated Projects
This resource is based on SIPANEL execution experience and technical decisions from real projects.
Need Technical Guidance For Your Project?
Whether you are evaluating systems, comparing suppliers, reviewing quantities, or preparing execution drawings, our engineering team can help before procurement begins.