32-Bed Military Hospital industrial project photography
Healthcare & EmergencyEmergency hospital — Full EPC delivery

32-Bed Military Hospital

اسم المشروع
32-Bed Military Hospital
الموقع
Raz & Jargalan, North Khorasan, Iran
المساحة m2
1,000 m²
نوع النظام
Sandwich Panel Systems

التحدي الرئيسي

During the COVID-19 emergency, a fully operational 32-bed military hospital was needed from excavation to readiness in under 50 days, requiring full EPC coordination.

القرار الهندسي

Engineering teams coordinated full EPC delivery — from excavation and structural construction to sandwich panel envelope, internal partitions, and final readiness — within an emergency timeline.

النتيجة المقاسة

A fully operational 32-bed military hospital was delivered from excavation to readiness in less than 50 days during the COVID-19 emergency.

المخاطر التي تم منعها

  • Schedule overrun beyond 50-day target
  • Coordination failures across EPC disciplines
  • Envelope weather protection delays
Mehrabad Airport Aircraft Hangar industrial project photography
Aviation InfrastructureAircraft Hangar

Mehrabad Airport Aircraft Hangar

اسم المشروع
Mehrabad Airport Aircraft Hangar
الموقع
Tehran, Iran
المساحة m2
5,000 m²
نوع النظام
Sandwich Panel System

التحدي الرئيسي

The main challenge was the severe curvature of the structure and the need for accurate sandwich panel installation over a continuous curved geometry.

القرار الهندسي

Precise coordination between the space frame, substructure, and panel installation sequence to preserve the curved form and avoid visual breaks.

النتيجة المقاسة

Successful execution of 5,000 m² of sandwich panel covering while maintaining the geometric continuity of the curved surface.

المخاطر التي تم منعها

  • Visual breaks on curved roof surface
  • Installation errors on curved geometry
  • Mismatch between structure and covering system
Erbil Eye Hospital Entrance Canopy industrial project photography
Healthcare FacilityHospital Entrance Canopy

Erbil Eye Hospital Entrance Canopy

اسم المشروع
Erbil Eye Hospital Entrance Canopy
الموقع
Erbil, Kurdistan Region, Iraq
المساحة m2
1,500 m²
نوع النظام
Polycarbonate Cladding & Space Frame

التحدي الرئيسي

The project required translating a symbolic architectural concept into a buildable structure while preserving the visual expression of the eyelid, iris, and eye geometry.

القرار الهندسي

Precise three-dimensional geometric control, custom cladding detailing, and phased installation to preserve the architectural intent throughout construction.

النتيجة المقاسة

Successful completion of approximately 1,500 m² of polycarbonate enclosure while maintaining the intended eye-shaped architectural identity.

المخاطر التي تم منعها

  • Loss of architectural eye geometry
  • Distortion of eyelid and iris forms
  • Mismatch between structure and enclosure
Tabas Railway Facility industrial project photography
Transportation & Sandwich Panel StructuresLarge-span railway roofing system

Tabas Railway Facility

اسم المشروع
Tabas Railway Facility
الموقع
Tabas, Iran
المساحة m2
10,000 m2
نوع النظام
Sandwich Panel Roofing System

التحدي الرئيسي

A large double-curved railway structure required advanced sandwich panel coordination, precise structural alignment, waterproofing continuity, and long-span roof performance.

القرار الهندسي

SIPANEL applied custom panel detailing, structural alignment studies, drainage optimization, and installation sequencing for long-span performance reliability.

النتيجة المقاسة

The railway roof was delivered with durable sandwich panel performance, controlled installation quality, and efficient execution.

المخاطر التي تم منعها

  • Structural misalignment
  • Drainage failures
  • Panel deformation
Mahshahr Taxi Parking Facility industrial project photography
Transportation & Sandwich Panel StructuresCommercial parking roofing system

Mahshahr Taxi Parking Facility

اسم المشروع
Mahshahr Taxi Parking Facility
الموقع
Bandar Mahshahr, Khuzestan, Iran
المساحة m2
4,000 m2
نوع النظام
Sandwich Panel Roofing System

التحدي الرئيسي

A humid coastal parking facility needed sandwich panel roof coordination, rainwater drainage management, waterproofing continuity, and corrosion-resistant detailing.

القرار الهندسي

SIPANEL optimized drainage slopes, gutter positioning, downspout coordination, and sandwich panel alignment to improve water evacuation and reduce maintenance risk.

النتيجة المقاسة

The roofing system was delivered with reliable rainwater management, durable weather protection, and controlled drainage performance.

المخاطر التي تم منعها

  • Water accumulation
  • Roof leakage
  • Corrosion-related failures
Ahvaz Airport Passenger Terminal industrial project photography
Airport InfrastructureAirport Passenger Terminal

Ahvaz Airport Passenger Terminal

اسم المشروع
Ahvaz Airport Passenger Terminal
الموقع
Ahvaz, Iran
المساحة m2
4,000 m²
نوع النظام
ZIP-TECH Roofing & Aluminium Cladding

التحدي الرئيسي

The main challenge was the curved front architectural feature, where the covering had to be bent in a perpendicular direction, making the execution technically difficult.

القرار الهندسي

Custom execution detailing, geometric control of the curved form, and precise coordination between substructure, aluminium panels, and ZIP-TECH system.

النتيجة المقاسة

Successful execution of 4,000 m² of ZIP-TECH and aluminium cladding while preserving the curved architectural form and final visual quality.

المخاطر التي تم منعها

  • Visual breaks in curved facade
  • Incorrect perpendicular bending
  • Mismatch between cladding and substructure
Tehran Mall Roof Garden, Food Court & Cinema Roof industrial project photography
Commercial & Entertainment ComplexLarge-Span Roof Structure

Tehran Mall Roof Garden, Food Court & Cinema Roof

اسم المشروع
Tehran Mall Roof Garden, Food Court & Cinema Roof
الموقع
Tehran, Iran
المساحة m2
Approx. 7,000 m²
نوع النظام
Space Frame + Sandwich Panel Roofing

التحدي الرئيسي

Creating large column-free commercial and entertainment spaces while meeting architectural and structural requirements.

القرار الهندسي

A long-span space frame system was selected to maximize open space, reduce structural weight and improve construction efficiency.

النتيجة المقاسة

Successful completion of a large-scale roofing structure serving multiple public-use functions within Tehran Mall.

المخاطر التي تم منعها

  • Excessive structural loads
  • Operational interference from columns
  • Large-span construction challenges
Megapars Mall Atrium industrial project photography
Commercial & Architectural Roofing SystemsAtrium roofing structure

Megapars Mall Atrium

اسم المشروع
Megapars Mall Atrium
الموقع
Iran
المساحة m2
4,500 m2
نوع النظام
ZIP Roofing System

التحدي الرئيسي

A large-span atrium roof required curved ZIP panel coordination, waterproofing integrity, thermal movement control, and clean architectural integration.

القرار الهندسي

SIPANEL prepared ZIP panel layouts, expansion movement studies, drainage coordination, and installation sequencing for long-span roof stability.

النتيجة المقاسة

The atrium roof was delivered with reliable waterproofing, precise standing seam execution, and controlled architectural integration.

المخاطر التي تم منعها

  • Water penetration
  • Thermal expansion stress
  • Roof alignment deviations
Absaar Water Park industrial project photography
Recreational & Hybrid Roofing SystemsWater park roofing and daylight integration system

Absaar Water Park

اسم المشروع
Absaar Water Park
الموقع
Iran
المساحة m2
12,000 m2
نوع النظام
Hybrid ZIP, Polycarbonate & Sandwich Panel Roofing System

التحدي الرئيسي

A large recreational roof needed daylight transmission, indoor ventilation, waterproof integration, and coordination between transparent sections, operable openings, and insulated panels.

القرار الهندسي

SIPANEL engineered roof zoning, automated ventilation opening integration, waterproof transitions, and support layouts for reliable environmental control.

النتيجة المقاسة

The project delivered controlled daylight, automated roof ventilation, thermal insulation efficiency, and long-term waterproof performance.

المخاطر التي تم منعها

  • Ventilation system malfunction
  • Water penetration at opening sections
  • Thermal imbalance
Andimeshk Stadium industrial project photography
Sports & Sandwich Panel StructuresDouble-curved stadium roofing system

Andimeshk Stadium

اسم المشروع
Andimeshk Stadium
الموقع
Andimeshk, Khuzestan, Iran
المساحة m2
6,000 m2
نوع النظام
Sandwich Panel Roofing System

التحدي الرئيسي

A double-curved stadium roof required sandwich panel coordination, structural alignment accuracy, waterproofing continuity, and controlled installation across arched geometry.

القرار الهندسي

SIPANEL prepared structural alignment studies, panel layout drawings, drainage details, and installation sequencing for geometric precision and roof performance.

النتيجة المقاسة

The stadium roof was delivered with reliable sandwich panel performance, accurate curved geometry, and controlled installation quality.

المخاطر التي تم منعها

  • Sandwich panel deformation
  • Drainage failures
  • Structural misalignment
Imam Khomeini Airport Hajj Passenger Terminal industrial project photography
Airport InfrastructurePassenger Waiting Hall

Imam Khomeini Airport Hajj Passenger Terminal

اسم المشروع
Imam Khomeini Airport Hajj Passenger Terminal
الموقع
Tehran, Iran
المساحة m2
5,000 m²
نوع النظام
Sandwich Panel & Polycarbonate System

التحدي الرئيسي

The primary challenge was the extremely compressed schedule between project award and the return of Hajj pilgrims, requiring immediate completion and operational readiness.

القرار الهندسي

Fast-track procurement, parallel installation activities, and integration of polycarbonate wall systems to maximize natural daylight within the hall.

النتيجة المقاسة

Successful completion and handover of a 5,000 m² airport facility in less than seven days.

المخاطر التي تم منعها

  • Operational delays before Hajj return flights
  • Airport capacity shortages
  • Insufficient daylight inside waiting areas
Kermanshah Industrial University Petroleum Faculty industrial project photography
Education & UniversityStructural Glass Facade

Kermanshah Industrial University Petroleum Faculty

اسم المشروع
Kermanshah Industrial University Petroleum Faculty
الموقع
Kermanshah, Iran
المساحة m2
1,000 m²
نوع النظام
Seismic-Responsive Glass Facade Connections

التحدي الرئيسي

The key challenge was designing facade connections so that structural movement during earthquakes would not damage or break the glass panels.

القرار الهندسي

Connection details were engineered to accommodate relative structural displacement and reduce stress transfer to the glass facade.

النتيجة المقاسة

Successful execution of approximately 1,000 m² of glass facade, which reportedly performed without glass damage during the Kermanshah earthquake in the 1390s Solar Hijri decade.

المخاطر التي تم منعها

  • Glass breakage under seismic movement
  • Facade connection failure
  • Mismatch between structure and glass facade
Shalamcheh Border Gate industrial project photography
Transportation InfrastructureBorder Terminal Entrance

Shalamcheh Border Gate

اسم المشروع
Shalamcheh Border Gate
الموقع
Khuzestan, Iran
المساحة m2
4,000 m²
نوع النظام
Sandwich Panel System

التحدي الرئيسي

The project required large unobstructed spans to accommodate heavy pedestrian and vehicle traffic while maintaining structural efficiency and climatic protection.

القرار الهندسي

A lightweight space frame solution with sandwich panel roofing was selected to maximize span capability and accelerate construction.

النتيجة المقاسة

Approximately 4,000 m² of covered border terminal infrastructure delivered.

المخاطر التي تم منعها

  • Traffic obstruction
  • Construction delays
  • Excessive structural weight
Bandar Mahshahr Urban Bus Terminal industrial project photography
Transportation InfrastructureUrban Passenger Terminal

Bandar Mahshahr Urban Bus Terminal

اسم المشروع
Bandar Mahshahr Urban Bus Terminal
الموقع
Bandar Mahshahr, Iran
المساحة m2
Approx. 4,000 m²
نوع النظام
Space Frame with Insulated Composite Roofing

التحدي الرئيسي

Providing shaded public space while ensuring durability against heat, humidity and corrosive environmental conditions.

القرار الهندسي

A lightweight space frame combined with insulated sheet roofing and rock wool insulation was selected to improve thermal performance and durability.

النتيجة المقاسة

Successful delivery of a large-scale terminal roof with efficient structural and thermal performance.

المخاطر التي تم منعها

  • Excessive solar heat gain
  • Environmental corrosion
  • Passenger circulation conflicts
Najafabad University Amphitheater industrial project photography
Education & Cultural FacilitiesAmphitheater and Convention Facility

Najafabad University Amphitheater

اسم المشروع
Najafabad University Amphitheater
الموقع
Najafabad, Isfahan, Iran
المساحة m2
4,000 m²
نوع النظام
Sandwich Panel System

التحدي الرئيسي

The project featured a highly complex architectural geometry including cantilevers, curved edges and irregular surfaces that required precise enclosure detailing.

القرار الهندسي

Custom support details and enclosure assemblies were developed to preserve the architectural intent while maintaining durability and weather protection.

النتيجة المقاسة

Successful execution of approximately 4,000 m² of architectural enclosure on a complex university landmark building.

المخاطر التي تم منعها

  • Architectural form distortion
  • Water leakage at geometric transitions
  • Excessive dead loads
Fadak Mall Glass Skylight industrial project photography
Commercial ComplexCentral Skylight

Fadak Mall Glass Skylight

اسم المشروع
Fadak Mall Glass Skylight
الموقع
Isfahan, Iran
المساحة m2
500 m²
نوع النظام
Glass Roofing System

التحدي الرئيسي

The project required the installation of a glass enclosure over a three-dimensional elliptical form while maintaining geometric accuracy, waterproofing performance, and visual transparency.

القرار الهندسي

Precise geometric control, custom glazing details, and installation management to achieve a seamless architectural skylight.

النتيجة المقاسة

Successful completion of a 500 m² glass skylight delivering natural daylight to the mall atrium.

المخاطر التي تم منعها

  • Geometric distortion
  • Water leakage
  • Mismatch between structure and glazing
Marun Petrochemical Multipurpose Hall industrial project photography
Oil, Gas & PetrochemicalIndustrial Gathering Facility

Marun Petrochemical Multipurpose Hall

اسم المشروع
Marun Petrochemical Multipurpose Hall
الموقع
Mahshahr, Iran
المساحة m2
5,000 m²
نوع النظام
Sandwich Panel & Tensile Membrane

التحدي الرئيسي

A critical engineering challenge was the development of a reliable structural interface between the tensile membrane system and the primary structure while maintaining load transfer integrity and long-term durability.

القرار الهندسي

A dedicated connection assembly was engineered, analyzed and fabricated specifically for the interaction between the tensile membrane structure and the main supporting frame.

النتيجة المقاسة

Successful completion of approximately 5,000 m² of hybrid enclosure within an active petrochemical environment.

المخاطر التي تم منعها

  • Stress concentration at membrane connections
  • Wind-induced membrane failures
  • Structural instability at force-transfer points
Toranj Kish Hotel Restaurant Roof industrial project photography
Hospitality & TourismOverwater Restaurant

Toranj Kish Hotel Restaurant Roof

اسم المشروع
Toranj Kish Hotel Restaurant Roof
الموقع
Kish Island, Iran
المساحة m2
Approx. 500 m²
نوع النظام
Space Frame + Sandwich Panel Roofing

التحدي الرئيسي

Construction in a highly corrosive marine environment with logistical and operational constraints.

القرار الهندسي

A lightweight space frame system was selected to minimize dead loads and facilitate installation over water.

النتيجة المقاسة

Successful completion of the restaurant roof structure in a demanding coastal environment.

المخاطر التي تم منعها

  • Marine corrosion
  • Excessive structural weight
  • Installation difficulties
Baharestan Prayer Hall industrial project photography
Public BuildingPrayer Hall

Baharestan Prayer Hall

اسم المشروع
Baharestan Prayer Hall
الموقع
Baharestan, Iran
المساحة m2
1,000 m²
نوع النظام
Sandwich Panel, Dry Ceramic Facade & Glass

التحدي الرئيسي

The main challenge was installing dry ceramic cladding on steep roof surfaces where conventional dry-facade systems are typically not applicable.

القرار الهندسي

Development and fabrication of custom connection systems capable of safely supporting ceramic panels on highly inclined roof geometries.

النتيجة المقاسة

Successful execution of 1,000 m² of enclosure and facade works while maintaining architectural continuity between roof and wall surfaces.

المخاطر التي تم منعها

  • Ceramic panel slippage on inclined surfaces
  • Connection failure under roof loads
  • Discontinuity between roof and facade
Enghelab Club Padel Center industrial project photography
Sports FacilitiesPadel Sports Hall

Enghelab Club Padel Center

اسم المشروع
Enghelab Club Padel Center
الموقع
Tehran, Iran
المساحة m2
2,000 m²
نوع النظام
Sandwich Panel System

التحدي الرئيسي

The project required large clear spans while maintaining structural efficiency and architectural quality within an active sports complex.

القرار الهندسي

A lightweight space frame structure combined with sandwich panels was selected to optimize span capability, construction speed and durability.

النتيجة المقاسة

Approximately 2,000 m² of sports facility enclosure delivered with large unobstructed interior space.

المخاطر التي تم منعها

  • Excessive structural weight
  • Obstruction of sports activities
  • Construction delays
Maku Convention Hall industrial project photography
Public & Cultural FacilitiesConvention Hall

Maku Convention Hall

اسم المشروع
Maku Convention Hall
الموقع
Maku, Iran
المساحة m2
2,000 m²
نوع النظام
Sandwich Panel System

التحدي الرئيسي

The large-span curved geometry required precise installation to maintain weather-tightness, architectural consistency and structural performance.

القرار الهندسي

A sandwich panel system was selected to combine lightweight construction, thermal efficiency and rapid installation.

النتيجة المقاسة

Successful installation of approximately 2,000 m² of sandwich panel enclosure over the large-span structure.

المخاطر التي تم منعها

  • Water penetration
  • Excessive roof dead load
  • Construction delays
Gonabad University Sports Hall industrial project photography
Education & SportsUniversity Sports Hall

Gonabad University Sports Hall

اسم المشروع
Gonabad University Sports Hall
الموقع
Gonabad, Iran
المساحة m2
3,000 m²
نوع النظام
Sandwich Panel System

التحدي الرئيسي

The project required accurate installation of sandwich panels on a large curved roof while maintaining alignment, weather-tightness, and architectural consistency.

القرار الهندسي

Careful installation sequencing and geometric control to ensure a uniform enclosure across the entire roof surface.

النتيجة المقاسة

Successful completion of 3,000 m² of sandwich panel enclosure for a university sports facility.

المخاطر التي تم منعها

  • Curved roof alignment issues
  • Mismatch between enclosure and structure
  • Waterproofing deficiencies
Shahr Babak Wrestling Hall industrial project photography
Sports & ZIP Panel StructuresMulti-dome wrestling sports complex

Shahr Babak Wrestling Hall

اسم المشروع
Shahr Babak Wrestling Hall
الموقع
Shahr Babak, Kerman, Iran
المساحة m2
900 m2
نوع النظام
ZIP Panel Roofing System

التحدي الرئيسي

Multiple dome-shaped sports halls required curved ZIP panel coordination, structural alignment, waterproofing continuity, and visually consistent roof finishing.

القرار الهندسي

SIPANEL prepared coordinated shop drawings, curved ZIP panel layouts, waterproofing details, and installation sequencing to maintain dome symmetry and drainage continuity.

النتيجة المقاسة

Three dome-shaped wrestling halls were delivered with coordinated roof geometry, reliable ZIP panel performance, and controlled installation quality.

المخاطر التي تم منعها

  • Curved roof alignment errors
  • Water penetration at dome transitions
  • Installation sequencing conflicts
Shahr Babak Stadium Entrance industrial project photography
Sports & Aluminium Cladding StructuresCurved architectural stadium entrance facade

Shahr Babak Stadium Entrance

اسم المشروع
Shahr Babak Stadium Entrance
الموقع
Shahr Babak, Kerman, Iran
المساحة m2
700 m2
نوع النظام
Aluminium Cladding System

التحدي الرئيسي

A complex curved stadium entrance required precise aluminium cladding detailing, adaptable surface coordination, waterproofing continuity, and seamless facade integration.

القرار الهندسي

SIPANEL combined aluminium cladding methods, curved flashing details, and installation sequencing to preserve architectural continuity and drainage control.

النتيجة المقاسة

The entrance was delivered with precise architectural finishing, controlled facade integration, and weather-resistant performance.

المخاطر التي تم منعها

  • Facade alignment errors
  • Surface waviness
  • Water penetration at curved transitions
Payam Industrial City Ceramic Manufacturing Facility industrial project photography
Industrial ManufacturingLong-span space frame industrial production hall

Payam Industrial City Ceramic Manufacturing Facility

اسم المشروع
Payam Industrial City Ceramic Manufacturing Facility
الموقع
Karaj, Iran
المساحة m2
4,500 m²
نوع النظام
Space Frame + Sandwich Panel Roofing

التحدي الرئيسي

Providing a large unobstructed production area while minimizing structural weight and construction time.

القرار الهندسي

A lightweight space frame system was selected to achieve long spans and operational flexibility for ceramic manufacturing processes.

النتيجة المقاسة

A 4,500 m² column-efficient production space optimized for manufacturing operations.

المخاطر التي تم منعها

  • Excessive structural weight
  • Column obstruction in production area
  • Construction delays
Tavanir Shahrekord Central Atrium industrial project photography
Office BuildingAtrium Skylight

Tavanir Shahrekord Central Atrium

اسم المشروع
Tavanir Shahrekord Central Atrium
الموقع
Shahrekord, Iran
المساحة m2
Approx. 350 m²
نوع النظام
Spider Glass System

التحدي الرئيسي

Providing maximum daylight and architectural transparency while maintaining structural efficiency.

القرار الهندسي

A lightweight space frame integrated with spider glass fittings was selected to minimize visual obstruction and maximize transparency.

النتيجة المقاسة

Completed transparent atrium enclosure delivering natural daylight and weather protection.

المخاطر التي تم منعها

  • Excessive structural weight
  • Daylight reduction
  • Visual obstruction
Bandar Abbas Mall industrial project photography
Commercial ComplexCentral Atrium Roof

Bandar Abbas Mall

اسم المشروع
Bandar Abbas Mall
الموقع
Bandar Abbas, Iran
المساحة m2
700 m²
نوع النظام
Sandwich Panel System

التحدي الرئيسي

The project involved installing enclosure systems over a prominent curved space-frame roof located at the center of a commercial development where architectural quality was critical.

القرار الهندسي

Careful geometric control, alignment of panel layouts with the curved structure, and detailed finishing works to achieve a continuous architectural surface.

النتيجة المقاسة

Successful completion of 700 m² of sandwich panel roofing for the central atrium enclosure.

المخاطر التي تم منعها

  • Visual discontinuity on curved surfaces
  • Geometry mismatch between roof and structure
  • Panel alignment defects
Tiran Gas Station industrial project photography
Commercial & Sandwich Panel StructuresGas station roofing system

Tiran Gas Station

اسم المشروع
Tiran Gas Station
الموقع
Isfahan, Iran
المساحة m2
600 m2
نوع النظام
Sandwich Panel Roofing System

التحدي الرئيسي

A fast-track public gas station required durable sandwich panel roofing, efficient sequencing, waterproofing reliability, and clean finishing under accelerated timelines.

القرار الهندسي

SIPANEL optimized sandwich panel layouts, structural coordination details, fastening strategies, and drainage integration for speed and durability.

النتيجة المقاسة

The gas station roofing system was completed with reliable weather protection, modern appearance, and controlled installation quality.

المخاطر التي تم منعها

  • Roof leakage
  • Installation alignment errors
  • Improper sealing execution
Eftekhar Commercial & Office Complex industrial project photography
Commercial & OfficeCentral Atrium Roof

Eftekhar Commercial & Office Complex

اسم المشروع
Eftekhar Commercial & Office Complex
الموقع
Isfahan, Iran
المساحة m2
300 m²
نوع النظام
Polycarbonate Roofing System

التحدي الرئيسي

The roof structure had to be integrated between existing building blocks while maintaining waterproof performance and structural efficiency.

القرار الهندسي

A lightweight space frame combined with polycarbonate panels was selected to create a column-free span with excellent daylight transmission.

النتيجة المقاسة

Approximately 300 m² of covered atrium space delivered without intermediate supports.

المخاطر التي تم منعها

  • Water infiltration
  • Excessive dead load
  • Insufficient daylight
Rouzbeh Charity Complex industrial project photography
Institutional & CharityCentral atrium roofing with space frame structure

Rouzbeh Charity Complex

اسم المشروع
Rouzbeh Charity Complex
الموقع
Zanjan, Iran
المساحة m2
1,000 m²
نوع النظام
Space Frame + Sandwich Panel Roofing

التحدي الرئيسي

Installing a long-span roof over a multi-storey structure under construction while maintaining compatibility with the reinforced concrete building frame.

القرار الهندسي

A lightweight space frame system combined with insulated sandwich panels was selected to optimize weight, speed, and thermal performance over the central atrium.

النتيجة المقاسة

A fully covered central space providing approximately 1,000 m² of protected area integrated into the multi-storey building structure.

المخاطر التي تم منعها

  • Excessive dead load on building frame
  • Construction delays from weather exposure
  • Incompatibility with RC structure
Shahrood Azad University Central Skylight industrial project photography
EducationCentral Skylight Roof

Shahrood Azad University Central Skylight

اسم المشروع
Shahrood Azad University Central Skylight
الموقع
Shahrood, Iran
المساحة m2
400 m²
نوع النظام
Polycarbonate Roofing System

التحدي الرئيسي

The skylight was installed on an existing roof structure, requiring careful control of dead loads, waterproofing details and structural integration.

القرار الهندسي

A dome-shaped space frame with multiwall polycarbonate panels was selected to provide uniform daylight while minimizing structural weight.

النتيجة المقاسة

Approximately 400 m² of naturally illuminated interior space created without intermediate supports.

المخاطر التي تم منعها

  • Water leakage
  • Excessive roof loading
  • Insufficient daylight
Atlas Hotel Atrium industrial project photography
HospitalityHotel Central Atrium

Atlas Hotel Atrium

اسم المشروع
Atlas Hotel Atrium
الموقع
Shahin Shahr, Isfahan, Iran
المساحة m2
700 m²
نوع النظام
Polycarbonate Roofing System

التحدي الرئيسي

The atrium served as the focal public space of the hotel and required a lightweight, translucent enclosure capable of delivering natural daylight while preserving architectural quality.

القرار الهندسي

Implementation of a polycarbonate enclosure to maximize daylight penetration, reduce structural weight, and maintain architectural continuity.

النتيجة المقاسة

Successful completion of a 700 m² polycarbonate atrium enclosure, creating a bright and welcoming hospitality environment.

المخاطر التي تم منعها

  • Insufficient daylight in the atrium
  • Excessive roof dead load
  • Architectural discontinuity
Tarbiat Modares University Research Greenhouse industrial project photography
Education & ResearchResearch Greenhouse

Tarbiat Modares University Research Greenhouse

اسم المشروع
Tarbiat Modares University Research Greenhouse
الموقع
Iran
المساحة m2
400 m²
نوع النظام
Polycarbonate Enclosure

التحدي الرئيسي

The project required the installation of a transparent enclosure over a complex dome-shaped geometry while maintaining durability, daylight performance, and structural efficiency.

القرار الهندسي

Implementation of lightweight polycarbonate panels combined with accurate geometric control of the space-frame structure.

النتيجة المقاسة

Successful completion of approximately 400 m² of polycarbonate enclosure for research and experimental greenhouse applications.

المخاطر التي تم منعها

  • Insufficient daylight penetration
  • Thermal performance issues
  • Geometry mismatch
Sepehan Flower Market industrial project photography
Commercial & Sandwich Panel StructuresCommercial sandwich panel roofing system

Sepehan Flower Market

اسم المشروع
Sepehan Flower Market
الموقع
Dorcheh, Isfahan, Iran
المساحة m2
3,500 m2
نوع النظام
Sandwich Panel

التحدي الرئيسي

A high-traffic commercial flower market needed durable sandwich panel roofing, fast installation, waterproofing control, and clean architectural finishing.

القرار الهندسي

SIPANEL optimized panel layouts, installation sequencing, sealing checkpoints, and material coordination to support fast-track execution and reduce waste.

النتيجة المقاسة

A durable commercial sandwich panel roofing system was delivered with reliable weather protection, efficient installation, and controlled finishing quality.

المخاطر التي تم منعها

  • Installation alignment errors
  • Material waste
  • Water penetration
Parand City Entrance Gate industrial project photography
Architectural & Aluminium Cladding StructuresArchitectural city entrance facade

Parand City Entrance Gate

اسم المشروع
Parand City Entrance Gate
الموقع
Parand, Tehran, Iran
المساحة m2
500 m2
نوع النظام
Aluminium Cladding System

التحدي الرئيسي

A special architectural city entrance needed custom aluminium cladding, curved geometry control, waterproofing continuity, and accurate finishing.

القرار الهندسي

SIPANEL designed curved transition details, edge coordination systems, structural alignment strategies, and sealing workflows for architectural consistency.

النتيجة المقاسة

The city entrance was delivered with precise geometry execution, durable aluminium cladding, and weather-resistant facade performance.

المخاطر التي تم منعها

  • Dimensional inconsistencies
  • Facade sealing failures
  • Curved alignment errors

هل تحتاج هذا المستوى من التحكم لمشروعك؟

أرسل نوع المشروع والموقع والمساحة التقريبية والرسومات إن وجدت والمخاطر الأساسية التي تريد من SIPANEL مراجعتها.

Get Free Engineering Review